SPRUTTEKIM® • Patent Priority #2026130625 • 100% HDG & Marine Grade

Modular Protection for Fuel & Energy, Data Centers & Marine Vessels Against UAVs and Kinetic Impacts

Engineered protection complexes SPRUT FEC (Fuel & Energy Complex) and SPRUT SEA (Marine Hull Protection): dual-contour load-bearing frame, 3 lateral wire-rope screens on cantilevers with shafts, 3 overhead roof contours, and nonlinear damping cascades. Significantly faster installation compared to mast-based systems.

SPRUTTEKIM® WE BUILD & PROTECT SPRUT FEC • SPRUT SEA Priority #2026130625
19.5% of CAPEX
Modular upgrade to Levels 3 & 4 in 5–10 days without shutting down operations
88–92%
Free airflow permeability for Data Center chillers and power transformers
0 Piles / 0 Welding
Surface precast foundation slabs and 100% bolted assembly on live facilities
Two Key Operational Advantages

Engineered for Live Critical Infrastructure — Without Piling, Welding, or Downtime

SPRUTTEKIM® complexes operate as an independent, zero-contact energy-absorbing barrier that transfers zero structural load to protected storage tanks, substation equipment, data center halls, or other strategic assets.

ADVANTAGE 01 • MODULARITY & SPEED

Multi-Fold Advantage in Deployment Speed Due to Modular Architecture

Substantial CAPEX and schedule savings compared to conventional protection systems.

ADVANTAGE 02 • MODULAR UPGRADE

Upgrade to Protection Levels 3 & 4 for Just 19.5% of Initial Budget

Rapid bolt-on installation of reinforcement dampers and cartridges without dismantling the frame.

Approved Protection Matrix

SPRUTTEKIM® Protection Levels (Categories 1–5)

Every project is engineered to the required threat category with a built-in modular upgrade path on a unified structural frame.

Protection Level (Category) Explosive Payload (TNT Eq.) Approach Velocity (UAV / Target) Typical Application
Level 1 50 kg 450 km/h Auxiliary substations, local energy nodes, and industrial yards
Level 2 120 kg 500 km/h Baseline standard: 5,000 m³ storage tanks (API 650), gas distribution stations, power plants, Data Centers
Level 3 200 kg 600 km/h Reinforced level — modular upgrade (+19.5% of initial cost in 5–10 days with zero downtime)
Level 4 250 kg 750 km/h Strategic energy hubs, major refineries, LNG terminals, and hyperscale AI Data Centers
Level 5 450 kg 0.98 Mach Maximum reinforced kinetic and blast protection for ultra-critical strategic facilities
Engineering Architecture

Dual-Contour Frame • 3 Lateral Screens • 3 Overhead Roof Contours

Impact energy is sequentially dissipated by three independent wire-rope screens on cantilevers with shafts, a pair of nonlinear dampers at the ends of every inter-contour brace, damped aerodynamic fairings, and hinged movable screw supports under the outer contour columns.

SPRUT FEC Engineering Cross-Section — Vertical Storage Tank (5,000 m³) Protection
3 wire-rope screens on cantilevers with inter-cantilever shafts
HINGED SCREW SUPPORTS ON PRECAST FOUNDATION SLABS (NO CONCRETE BASE UNDER SLABS) PROTECTED ASSET STORAGE TANK 5,000 m³ (1/2 SECTION) Zero Shell Contact • 100% Bolted (Zero Welding) Tank Axis (center) 45° 3 OVERHEAD LOAD-BEARING CABLE CONTOURS (DAMPERS ON BOTH ENDS) C1 C2 C3 2 END DAMPERS 45° 45° 0.4 m FAIRINGS WITH DAMPERS SCREEN #1 Cables on shafts Top/bottom dampers 1.5 m 2.0 m Buffer clearance OUTER CONTOUR INNER CONTOUR S2 S3
Dampers (at both ends of inter-contour braces, top/bottom of all 3 screens on shafts, both sides of overhead cables, and inside fairings) 3 wire-rope screens on cantilevers with shafts (S1: 1.5 m outward at 45°; S2: outward from tank; S3: 0.4 m toward tank) 3 overhead load-bearing cable contours (C2 anchored to 45° cantilever of Inner Contour) Hinged screw supports on individual precast foundation slabs (no poured concrete base)
SPRUT FEC Engineering Cross-Section — Data Center Outdoor Chillers & Diesel Generators Protection
3 wire-rope screens on cantilevers with inter-cantilever shafts
UNDERGROUND FIBER OPTICS & CABLES — SURFACE PRECAST SLABS ONLY (NO CONCRETE BASE OR PILING) FAIRINGS WITH DAMPERS CHILLER YARD Unrestricted Heat Rejection DIESEL GENERATORS Tier III / IV Data Center 88–92% FREE AIRFLOW PERMEABILITY 3 OVERHEAD CABLE CONTOURS (DAMPERS ON BOTH ENDS) • INNER CONTOUR LOWER THAN OUTER
100% Hot-Dip Galvanized (HDG) • -60 °C to +55 °C

Industry Solutions for Fuel & Energy Facilities and Data Centers

Low-alloy structural steel with full hot-dip galvanizing — engineered and proven for Arctic, temperate, and extreme desert climates.

SPRUT FEC • OIL, GAS & TANK FARMS

Vertical Storage Tanks (API 650) & Process Units

Self-supporting 2- or 3-contour frame (depending on target protection level). Complete installation with zero hot-work permits and no interruption to product transfer.

14 days installation per 5,000 m³ tank Zero shell contact 100% HDG
SPRUT FEC • POWER GENERATION & GAS DISTRIBUTION

Power Plants, Gas Stations & 220–500 kV Substations

Engineered designs for thermal power plants, substations, and gas distribution stations (including seismic zones and extreme climates). Up to 55% CAPEX savings vs. mast-based systems.

All-climate HDG steel
SPRUT FEC • TIER III / IV DATA CENTERS

Outdoor Chiller Yards, Diesel Generators & Substations

Open wire-rope architecture delivers 88–92% free airflow with zero thermal recirculation. Individual precast foundation slabs are installed without drilling or piling.

88–92% free airflow
OPERATION IN ALL CLIMATIC ZONES

High Field Maintainability & Rapid Recovery

Factory-prefabricated 6000×5500 mm modular screen cards enable rapid restoration of a damaged sector by a standard crew without heavy cranes.

The marine protection diagram illustrates a fragment of the retractable, transformable underwater and above-water hull protection system.

SPRUT SEA: Above-Water and Underwater Vessel Hull Protection

Marine-grade execution in Superduplex SAF 2507 and stainless steel AISI 316Ti.
The system protects the above-water hull and extends 4.5 m below the waterline. The above-water contour overlaps the underwater contour vertically by at least 1.0 m above the waterline.

Above-Water Hull Section (positioned directly above the waterline in combat mode)

During storms or in the absence of threats, cantilevers with protective screens fold into a vertical position and retract vertically 2.0 m above the waterline via slider guides.

Underwater Hull Section (4.5 m below waterline and 1.0 m above waterline in combat mode)

During storms or transit, the load-bearing cantilevers with protective screens are lifted 2.0 m above the waterline and stowed in a vertical position along the hull.

SPRUT SEA — Underwater and Above-Water Vessel Hull Protection Schematic
Top of underwater screens ≥ 1.0 m above lower edge of above-water barrier in combat mode • 4.5 m submerged depth
WATERLINE VESSEL HULL DECK CANTILEVER ≥ 1.0 m above water 4.5 m underwater ABOVE-WATER HULL BARRIER deployed directly above waterline OVERLAP ZONE at least 1.0 m above waterline UNDERWATER HULL BARRIER 4.5 m below waterline & 1.0 m above waterline
Direct Engineering Inquiry

Contact Us

Detailed engineering calculations, explicit dynamic simulations, and working drawings are provided under a mutual Non-Disclosure Agreement (NDA).

SPRUTTEKIM® Engineering Contacts

Developer and IP holder of SPRUTTEKIM® protection systems — SPRUT FEC & SPRUT SEA (Patent Priority #2026130625).

Office Phone
General Director — Viacheslav Novikov
Technical Director — Oleg Romanov
Process Engineer — Gevorg Soloyan
Official Email for Technical Proposals & Inquiries
Confidentiality
Engineering documentation and FEM dynamic simulation dossiers are shared upon execution of a mutual Non-Disclosure Agreement (NDA).